top of page
Organic Hemp Long Line Lead 7ft
  • Organic Hemp Long Line Lead 7ft

    £21.99Price

    These gorgeous long line leads are handmade by Dogs Adored, from 100% Organic Natural Hemp and hand dyed using an ecofriendly dye. These lovely long leads measure 240cm (7ft 8") and 1.9cm (3/4") wide, the long length making them perfect for practising recall or just for those times when you want to give your dog a little more freedom, but still keep them on lead. The leads have a durable metal clip to attach to a collar or harness.

     

    Hemp is extremely strong and durable, which is also much more resistant to mold than cotton (great for those dogs who love to run through puddles), and hypoallergenic; great for those sensitive pups. Hemp is also a fantastic environmental choice, as it reqires less water, grows very quickly and uses minimal nutrients from the soil. 

     

    These leads are available in a shorter length (120cm/4ft) and are slightly wider (2.5cm/1"). Matching collars are available

    • Care Instructions

      Machine washable at 30°C. Wash with similar colours. Put in an old pillowcase to save your machine from the hardware.

    Related Products